Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the broken-link-checker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/salam-petrol/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rank-math domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/salam-petrol/public_html/wp-includes/functions.php on line 6114
Upgrade of Fuel Gas Compressor Control Panels

Upgrade of Fuel Gas Compressor Control Panels

March 7, 2015

Client : Qatar Gas Operating Company Limited (Qatar Gas)

The contract is to carry out upgrade of obsolete control systems of Fuel Gas Compressor to the latest system in all three trains.

Salam Petroleum – The scope of services includes :

  • Engineering and Design
  • Procurement of materials and equipment
  • Installation
  • Commissioning

Upgrade of Fuel Gas Compressor Control Panels

More details visit Salam Petroleum Website